August 2026
Contractor selected for off-site improvements
After carefully reviewing four competitive bids, the Masjid Al Tawheed Board of Directors is pleased to announce that Alccon General Engineering has been selected and awarded the off-site improvements project.
This phase includes constructing a second entrance and exit, along with a dedicated left-turn pocket.
Alccon brings decades of construction experience in the Sacramento region, including valuable experience working with the City of Elk Grove. The contractor has also met all required General A licensing, bonding, and documentation requirements for this phase.
We are excited to move forward, with construction currently anticipated to begin in September 2026, inshaAllah.
Off-site improvement plan