Years of planning, approvals and construction have brought the project to this point. Here is what our community has accomplished—and what comes next.

01

2015–2021 · Complete

Land, planning and approvals

Property acquisition, design and years of engineering and agency review led to unanimous, 5–0 approval from the City of Elk Grove Planning Commission.

02

2022–2024 · Complete

Major site work

Excavation, the concrete masonry wall and fencing prepared the site. Phase II brought grading and underground electrical, plumbing and utility connections.

03

2025 · Complete

Parking and infrastructure

Major grading and compaction tests were completed, the stormwater retention pond was built, and asphalt was laid for approximately 130 parking spaces, with lighting infrastructure and designated EV charging spaces.

04

2026 · In progress

Off-site improvements

A second entrance and exit, a dedicated left-turn pocket and road improvements. Permits are in hand and the contract has been awarded; the campaign site reports construction is underway.

05

Next · Planning

Final building approvals

Complete the building plans and secure the approvals needed before construction of the new Masjid building can begin.

06

Next · Construction

Build the new Masjid

The Masjid itself: a permanent home with more room for prayer, learning and community life. Every completed stage has helped prepare the ground.

Progress, documented

Construction updates

Explore the latest project news by year. Each update records the decisions, approvals and work moving the new Masjid forward.

2026   •   2 updates

August 2026

Contractor selected for off-site improvements

After carefully reviewing four competitive bids, the Masjid Al Tawheed Board of Directors is pleased to announce that Alccon General Engineering has been selected and awarded the off-site improvements project.

This phase includes constructing a second entrance and exit, along with a dedicated left-turn pocket.

Alccon brings decades of construction experience in the Sacramento region, including valuable experience working with the City of Elk Grove. The contractor has also met all required General A licensing, bonding, and documentation requirements for this phase.

We are excited to move forward, with construction currently anticipated to begin in September 2026, inshaAllah.

Off-site improvement plan

February 2026

Off-site improvements and building plans

Masjid Al Tawheed is seeking additional bids for the off-site portion of the project. This work includes constructing an additional entrance and exit, as well as a new left-turn pocket.

Alhamdulillah, we have received the necessary permits for this phase and are currently contacting contractors to obtain additional bids.

Meanwhile, our engineering team continues to develop the building plans in preparation for the first-round submission to the City of Elk Grove.